license Licensed & Insured South Florida Contractor

Bathroom and Kitchen Remodeling Companies

TD
Todd Delfarno
President & Licensed Contractor — CGC 1516154 / CCC 1328696
Bathroom and Kitchen Remodeling Companies — Assured Supreme Contracting, Oakland Park, South Florida

If both your kitchen and a bathroom are overdue for an update, you face two decisions at once: should both rooms be tackled together or one after the other, and should one firm handle everything or should you hire specialists for each? Bathroom and kitchen remodeling companies vary widely in how they answer those questions, from cabinet showrooms that subcontract installation to full-service licensed contractors who manage every trade. Comparing the options side by side makes the right fit much easier to spot.

Why these two rooms belong in the same conversation

Kitchens and bathrooms are the wet rooms of a house. They rely on the same trades (plumbers, electricians, tile setters, cabinet installers, countertop fabricators and drywall finishers) and the same inspections for rough plumbing and electrical work. They also share a vulnerability to moisture, which in Florida's climate makes ventilation, waterproofing and leak prevention top priorities in both spaces. Because the skill sets overlap so heavily, a single experienced team can often handle both rooms efficiently.

Specialist shops versus full-service contractors

Here is how the main types of companies typically compare:

For anything beyond a like-for-like swap, a general contractor usually delivers the smoothest experience because the plumbing rough-in, cabinet layout, electrical boxes and tile details are planned together rather than negotiated between separate companies.

Ready to start your project?

Get a free, no-pressure consultation and an honest written quote from a licensed Florida team.

Doing both rooms together or in phases

Remodeling both spaces at the same time has clear advantages. The crew mobilizes once, inspections can be grouped, material orders can be combined, and the disruption happens in a single block rather than twice. If you are also replacing flooring that runs through the house, or upgrading the electrical panel or water heater, those shared items only need to be done once.

The tradeoff is livability. With the kitchen and a bathroom out of service simultaneously, daily life gets harder, especially if the home has only one other bathroom. Phasing can make sense when budgets need to be spread over time, when the household cannot spare both rooms, or when one space is urgent because of a leak or failed shower. A common compromise is to start the bathroom first, since it usually finishes sooner, then begin the kitchen as the bath wraps up so the crews overlap without leaving you without both rooms for long.

How to compare bathroom and kitchen remodeling companies

Once you have a shortlist, measure each company against the same yardstick:

A company that answers every item clearly and in writing is far more likely to deliver what it promises.

What a combined two-room schedule can look like

When both rooms are in one contract, a well-run job staggers them so trades flow from one space to the next instead of standing around. Demolition might happen in the bathroom first while kitchen cabinets are still in production. The plumber roughs in the bathroom, then moves to the kitchen once its walls are open, and both rough-ins can be inspected close together. The tile setter finishes the shower while the cabinet installer sets kitchen boxes, and the countertop fabricator templates the kitchen and the vanity top on the same visit. Fixtures and appliances are connected at the end, followed by a single final walkthrough.

This kind of choreography is where an experienced general contractor earns their fee. Each trade arrives once per phase, inspections are grouped and you lose use of each room for the shortest practical time.

Red flags worth walking away from

Some warning signs show up early. A company that will not put its license number on the proposal, pressures you to sign the same day with an expiring discount, asks you to pull the permit as an owner-builder, or wants most of the money before work starts deserves a hard second look. So does a bid that describes the shower as simply tile with no mention of waterproofing, or a kitchen quote that never mentions who reconnects the plumbing. Vague paperwork at the beginning rarely becomes clearer once the walls are open.

The kitchen and bathroom share trades, inspections and moisture risks, so one licensed team coordinating both rooms usually means fewer gaps and clearer accountability.

Budgeting across two rooms

Costs for each room depend on size, layout changes, materials and the condition of what is behind the walls. Moving plumbing, changing the footprint, choosing custom cabinets or stone counters, and building a fully tiled shower all raise the number, while keeping fixtures in place and choosing semi-custom products keeps it in check. Our articles on bathroom remodel costs in Florida and kitchen remodel costs break down the main drivers for each space. When you are combining rooms, ask for a quote that shows each one separately so you can phase if needed without re-bidding.

Moisture protection in both rooms

The Florida climate punishes shortcuts in wet rooms. In bathrooms, look for a continuous waterproof membrane on shower walls and floors, a proper slope to drain, a flood test before tile, and an exhaust fan ducted outdoors. In kitchens, sink bases need protection from leaks, dishwasher connections need careful attention, and the range hood should vent outside rather than recirculate. If you are thinking about replacing an old tub, our page on tub-to-shower conversions explains the process.

Working with Assured Supreme Contracting

Assured Supreme Contracting is a licensed and insured Florida contractor that handles kitchens, bathrooms, cabinets, additions and roofing. We pull permits, manage every trade with one accountable team and stand behind our work with a workmanship warranty. If you are comparing bathroom and kitchen remodeling companies anywhere in Florida, schedule a free consultation for an itemized written quote covering one room or both.

Frequently Asked Questions

It can be. Combining projects avoids mobilizing crews twice, lets inspections and material orders be grouped, and means shared work such as flooring or a water heater upgrade happens once. The savings depend on the scope, and the added disruption of losing both rooms at once is a real cost to weigh.

Many homeowners start with the room that has an urgent problem, such as a leaking shower. Without an emergency, the bathroom often goes first because it usually finishes faster, and the kitchen follows. If you have only one bathroom, plan temporary arrangements carefully before demolition begins.

Most families can, provided the house has another working bathroom and a temporary kitchen setup is arranged. Expect dust, noise and some utility shutoffs. A contractor who uses dust barriers, keeps work areas tidy and communicates the schedule makes the experience much easier.

You can, but discuss it with your contractor first. Owner-supplied items can create schedule risk if they arrive late, damaged or with the wrong specifications, and the contractor's warranty may not cover them. Many homeowners select products themselves and let the contractor order them so dimensions and lead times are managed.

An allowance is a budget placeholder for items not yet selected, such as tile, faucets or lighting. If your final choice costs more, the difference is added; if less, it is credited. Realistic allowances make a quote trustworthy. Unrealistically low ones make a bid look cheaper than the finished project will be.

Many do. Relocating plumbing, adding circuits, changing walls or replacing a shower pan typically requires permits and inspections. Purely cosmetic work like painting or replacing a vanity in the same spot may not. Rules vary by jurisdiction, so a licensed contractor should confirm with the building department.

Proper waterproofing, ventilation and leak prevention are the foundation. Showers need a continuous membrane and correct slope, exhaust fans should vent outdoors and run long enough to clear moisture, and plumbing connections should be tested. Keeping the air conditioning running helps control indoor humidity throughout the home.

It is not required, but a consistent palette of hardware finishes, cabinet styles or flooring can make a home feel cohesive, especially in open plans where rooms are visible from each other. Bathrooms can also be a place to experiment with bolder tile while the kitchen stays more neutral.

Getting a few detailed quotes lets you compare scope, allowances, timelines and warranties. More important than the number is that each quote describes the same project. Share the same written wish list with every company so the proposals can be compared fairly line by line.

Be cautious. Florida law sets conditions on contractors who accept significant deposits, and payment schedules tied to completed milestones protect homeowners. Ask what the deposit covers, such as custom cabinet orders, and get the payment terms in writing before signing any contract.

Many full-service contractors coordinate design, either in-house or with partner designers, then build the project themselves. This keeps decisions and responsibility in one place. Ask what design services are included, how many revisions are allowed and whether drawings are part of the quote.

Clear the work areas and paths, remove valuables and fragile items from nearby rooms, set up a temporary kitchen or bathroom arrangement, and plan for pets and children. Confirm parking for crew vehicles and where materials can be staged. A pre-construction meeting is the right time to settle these details.

What We Do

Our South Florida Services