license Licensed & Insured South Florida Contractor

Bathroom People

TD
Todd Delfarno
President & Licensed Contractor — CGC 1516154 / CCC 1328696
Bathroom People — Assured Supreme Contracting, Oakland Park, South Florida

When homeowners say they need the bathroom people, they usually mean whoever can turn a dated or failing bathroom into a new one. In reality, a remodel involves a whole cast: a general contractor who manages the job, a licensed plumber and electrician, a tile setter, often a cabinet installer and a glass fabricator, sometimes a designer, and the building inspector who signs off on the work. Knowing who does what helps you hire wisely, ask better questions and understand why a well-run project follows a particular order.

Let's meet each role in the sequence they usually appear on a Florida project, and see where the handoffs between them can go right or wrong.

The Project Lead: Your General Contractor

The general contractor is the person responsible for the whole outcome. They write the scope of work, price it, pull the permit, schedule each trade, order materials, protect your home during construction and coordinate inspections. When a problem appears, such as rotted subfloor under the old tub, the contractor decides how to fix it, documents it and brings you a change order.

Most importantly, the contractor is accountable for how the trades fit together. If the plumber sets the shower valve at the wrong depth for the tile thickness, the contractor catches it before the wall is closed. In Florida, you can verify a contractor's license on the DBPR website, and our article on why you should hire a licensed contractor explains what that protects.

The Designer or Design Lead

On larger projects, a designer helps plan layout, fixture placement, storage and finishes. In many remodeling companies, this role is handled by the contractor or a project manager during the consultation. Good design work answers practical questions early: Will the door swing clear the toilet? Is there room for a bench in the shower? Where will towels hang within reach? Should the vanity have drawers instead of doors?

If someone in the household has mobility needs now or might later, design is also where accessibility features belong. Our article on the aging in place bathroom covers curbless showers, blocking for grab bars and wider clearances.

Ready to start your project?

Get a free, no-pressure consultation and an honest written quote from a licensed Florida team.

The Demolition Crew

Demolition looks simple, but careful demo protects the rest of your house. The crew shuts off water, protects floors along the path to the exit, sets up dust barriers, removes fixtures and tile, and disposes of debris. They also stop when they find something unexpected, such as termite damage or a cracked drain, so the contractor can assess it rather than covering it up.

Ask where debris will go. Tile, mortar and cast iron are heavy, and a dumpster or haul-away trailer needs a spot that will not damage the driveway or violate HOA rules. A crew that plans the debris path, covers the route and vacuums daily leaves the rest of the house livable while the bathroom is torn apart.

The Licensed Plumber

The plumber handles everything that carries water in and out of the room. That includes drain lines and their slope, vent connections, supply lines, shutoff valves, the shower valve body, tub drain and overflow, and the toilet flange. Most of this happens during rough-in, before walls are closed, and then again at trim-out, when faucets, shower trim and the toilet are installed. In Florida, plumbing work generally requires a licensed plumbing contractor, and the rough-in is typically inspected under the permit.

The Licensed Electrician

The electrician runs circuits for lighting, receptacles and the exhaust fan, installs GFCI protection where required, and adds circuits for features like heated floors, lighted mirrors or a towel warmer. Placement matters: switch locations, vanity light height and the position of outlets near the mirror affect daily convenience. Like plumbing, electrical work is inspected at rough-in before drywall.

The Tile Setter and Waterproofing

The tile setter is often the most visible craftsperson in the room, but their most important work is the part you never see. Before setting a single tile, they or a dedicated installer build the shower floor with proper slope to drain, install backer board, and apply a continuous waterproof membrane sealed at seams, corners, niches and the drain. A water test of the pan confirms it holds before tile goes down.

Then come layout decisions: where cuts will land, how the pattern centers on the wall, how grout lines align between floor and wall, and how edges are finished with trim or mitered corners. A skilled setter plans the layout before mixing thinset.

Cabinet, Countertop and Glass Installers

After tile, specialists finish the room. A cabinet installer sets the vanity level and anchored to framing. A countertop fabricator templates and installs the top, cutting for the sink and faucet. A glass company measures the finished shower opening and later returns to install the frameless panels or framed door. Because glass is measured after tile is complete, its lead time affects when you can use the shower, which is why the contractor plans it from the start.

The Building Inspector

The inspector represents the local building department and checks that permitted work meets the Florida Building Code. Typical visits include rough plumbing and rough electrical before walls close, and a final inspection when the job is done. Inspectors are not there to judge appearance. They focus on safety and code compliance. Passing inspections creates a record that matters for insurance and resale.

Why the Bathroom People Need One Leader

Every handoff between trades is a chance for something to slip. The plumber sets the drain where the old plan showed it, but the vanity changed. The electrician mounts a box where the mirror will now hang. The tile setter assumes the niche is framed when it is not. When one accountable team runs the project, those conflicts get solved on paper, not in finished walls.

A bathroom remodel is a relay among several trades. The quality of the handoffs, managed by one accountable contractor, matters as much as the skill of any individual installer.

A Short Hiring Checklist

Before you sign, confirm the contractor's license and insurance, ask which trades are in-house and which are subcontracted, check that subcontractors are licensed where required, ask who pulls the permit, request an itemized written proposal, and ask how the shower waterproofing will be done and tested. Those answers tell you how the team works.

Assured Supreme Contracting is a licensed and insured Florida contractor that pulls permits and brings every trade together under one accountable team, with a workmanship warranty on the finished bathroom. Explore our bathroom remodeling services, and if you are looking for bathroom people who will plan every handoff before work begins, book a free in-home consultation for an itemized written quote.

Frequently Asked Questions

Start with a licensed general contractor who handles bathroom projects. They can assess the room, discuss your goals, identify which trades are needed and give you an itemized proposal. Calling a plumber or tile setter first can work for small repairs, but a full remodel benefits from someone coordinating everyone from the beginning.

Not always. Many remodeling contractors help with layout and selections during the consultation, which is enough for straightforward bathrooms. A dedicated designer can add value for complex layouts, luxury finishes or accessibility planning. Either way, decisions about layout, storage and fixtures should be made before demolition so the trades can plan around them.

Plumbing work in Florida generally requires a licensed plumbing contractor, so a tile installer should not move drains or replace valves unless properly licensed. Many projects combine trades under a general contractor who uses licensed specialists. Ask who will perform each part of the work and confirm their licensing before work begins.

The general contractor or their project manager schedules trades, checks work before it is covered, manages deliveries, coordinates inspections, protects your home, handles changes and keeps you informed. They may not personally swing every hammer, but they are responsible for the result and are the person you contact with questions or concerns.

It depends on the scope and local requirements. Projects that alter plumbing or electrical commonly have rough-in inspections before walls are closed and a final inspection at completion. Some jurisdictions have additional checks. Your contractor should explain which inspections apply and schedule them so they do not stall progress.

Shower glass must fit the finished tile dimensions precisely, so it is measured after tile is set and cured. The panels are then fabricated to those measurements, which takes time. Planning for this gap prevents frustration. Some homeowners use a temporary curtain so the shower is usable while waiting for glass.

Trim-out is the final plumbing stage, after walls and tile are finished. The plumber installs visible components such as faucets, shower handles and heads, the toilet and drain fittings, then tests for leaks. It follows the rough-in stage, which happens before walls are closed and covers the pipes hidden inside them.

You can, but you become responsible for scheduling, sequencing and resolving disagreements between trades. If a problem arises, each may point to another. Hiring separately can save money for experienced owners with simple projects, while full remodels usually go more smoothly with one contractor coordinating every trade.

Ask which parts of the job are subcontracted, whether those subcontractors are licensed and insured, how long the contractor has worked with them and who supervises their work. Also ask how lien releases are handled so you are protected if a subcontractor or supplier claims they were not paid.

Yes, if planned before tile installation. Electric radiant mats or cables are laid over the subfloor, connected to a dedicated circuit and thermostat, and covered with thinset and tile. The electrician and tile setter must coordinate closely. It is difficult to add later, so decide early if you want this feature.

Ask your contractor which waterproofing system is being used and request photos of it before tile installation. A water test of the shower pan, with the drain plugged and water held for a period, is a strong indicator. Following the manufacturer's installation requirements also preserves product warranties on the membrane.

The contractor is typically responsible for removing debris and leaving the space broom clean, with fixtures and surfaces wiped down. Ask whether a final detailed cleaning is included or treated separately. A good team also cleans up daily during the project, keeping dust and materials contained to the work area.

What We Do

Our South Florida Services