license Licensed & Insured South Florida Contractor

Kitchen Cabinets Tampa Florida

TD
Todd Delfarno
President & Licensed Contractor — CGC 1516154 / CCC 1328696
Kitchen Cabinets Tampa Florida — Assured Supreme Contracting, Tampa, Florida

Before ordering new kitchen cabinets Tampa Florida homeowners face an earlier decision: keep the existing boxes and refresh them, or tear everything out and start over. The right answer depends on the condition of the boxes, whether the layout works, and how long you plan to stay in the house. Once that call is made, the project follows a predictable sequence from measuring to final adjustments, and knowing that sequence helps you judge any installer's work.

This article is organized around those two parts. First, a straightforward way to decide between painting, refacing and full replacement. Second, a step-by-step look at how a professional cabinet project unfolds, so you know what should happen on your job and in what order.

Start by Assessing What You Already Have

Open every door and drawer in your kitchen and look closely. Are the boxes solid wood or plywood, or are they particleboard that has swelled around the sink? Do the face frames feel sturdy? Are the shelves sagging? Does the layout give you enough counter space and storage, or do you constantly wish the fridge or dishwasher were somewhere else? Answering honestly sorts your options quickly.

Painting, Refacing or Replacing

Professional painting keeps everything in place and changes only the color. It can look sharp if the doors have a style you still like, but it cannot fix worn hinges, tired drawer slides or damaged edges, and paint applied over old finishes needs careful prep to bond well in a humid kitchen.

Refacing goes further. The old doors and drawer fronts are replaced, and the exposed face frames and end panels are covered with a matching veneer or laminate. New hinges and pulls go on at the same time, and many homeowners add soft-close hardware and new drawer boxes. Our article on kitchen cabinet refacing covers what that process includes.

Ready to start your project?

Get a free, no-pressure consultation and an honest written quote from a licensed Florida team.

Full replacement is the only path when the boxes themselves are compromised or when the layout has to change. It also lets you choose better construction, such as plywood boxes, full-extension slides and taller wall cabinets that reach the ceiling for more storage. Because countertops sit on the cabinets, replacement almost always means new counters too.

Refacing saves the boxes, not the layout. If you dislike where things are, new doors will not fix it.

Step One: Measuring and Design

A proper cabinet project starts with precise field measurements, including wall lengths at several heights, ceiling height, window and door trim, outlet and plumbing locations and the exact sizes of appliances. Walls in older homes are seldom perfectly straight or square, and the design must leave room for fillers where cabinets meet walls so doors and drawers can open past the trim.

From those measurements, the designer produces a layout and elevations showing every box, filler, panel and molding. Review them carefully. Check that the dishwasher has a filler next to the corner, that the refrigerator door can open fully past the adjacent wall, and that drawer stacks sit where you actually prep food.

Step Two: Ordering and Lead Time

Once the design is approved, cabinets are ordered. Lead times vary by cabinet line and finish, and semi-custom and custom lines typically take longer than stock. A well-run project waits to start demolition until a delivery date is confirmed, so your kitchen is not torn out while you wait. When cabinets arrive, they should be inspected against the order for damage, finish defects and missing pieces before installation begins.

Storage of delivered cabinets matters too. Boxes should stay in a dry, conditioned space rather than a hot garage where humidity swings can affect finishes and cause doors to move. If cabinets must wait a few days, keep them in their cartons, off the floor and away from exterior doors that are opened often during demolition.

Step Three: Installing Kitchen Cabinets Tampa Florida Homes Depend On

Installation starts with layout lines on the wall. The installer finds the high point of the floor and establishes a level reference so every base cabinet ends up at the same height, which is essential for a flat countertop. Base cabinets go in first, each shimmed to that line and screwed through the back rail into studs. Adjacent boxes are clamped and fastened together so the face frames sit perfectly flush.

Wall cabinets come next. Many installers temporarily screw a ledger board to the wall to support the uppers while they are fastened, keeping them perfectly aligned. Crown molding, light rail and toe-kick trim finish the look. If you want more detail on install-day steps, our guide to kitchen cabinet installation explains each stage.

Step Four: Countertops, Hardware and Adjustments

Countertop fabricators template after the base cabinets are set and secured, then return to install the tops once they are cut. Plumbing and appliances are connected after counters are in. Hardware such as knobs and pulls is installed using a template so every piece lines up. A final adjustment pass sets door reveals, aligns drawer fronts and confirms that soft-close mechanisms work smoothly.

Expect to see minor adjustments needed in the weeks after installation as the cabinets settle and humidity changes. A contractor who offers a workmanship warranty will come back to tweak hinges and drawer fronts.

When Other Trades Get Involved

If the project stays in the same footprint, cabinet work alone often does not need a permit. Relocating a sink, adding circuits for under-cabinet lighting or an island, or modifying walls brings plumbing and electrical work that generally requires permits and inspections under the Florida Building Code. That is when having one licensed contractor coordinate everything saves time and keeps inspections on track.

Assured Supreme Contracting is a licensed and insured Florida contractor serving Tampa and homeowners statewide. We offer a free in-home consultation, an itemized written quote, permit handling and a workmanship warranty.

Whether to reface or replace, and how to install kitchen cabinets Tampa Florida kitchens will rely on for years, is easier to decide in person. Book a free consultation and we will inspect your current boxes and give you honest options in writing.

Frequently Asked Questions

Check for swelling or soft spots around the sink and dishwasher, sagging shelves, loose face frames and water stains. Solid wood or plywood boxes in good condition are often worth keeping. If the boxes are particleboard with visible water damage, replacement is usually the more reliable choice.

Painting changes only the color of existing doors and frames. Refacing replaces the doors and drawer fronts and covers the frames with new veneer or laminate, often with new hinges and pulls. Refacing allows a complete style change, while painting keeps the original door design.

Usually yes. Countertops are fastened to the base cabinets, and removing them risks cracking, especially with stone. New cabinets may also differ slightly in size or height. Most homeowners replace counters along with cabinets so templating is done on the new bases.

Fillers provide space so doors and drawers can open without hitting walls, trim or appliances. They also absorb irregularities in walls that are not straight or square. A good installer scribes fillers to match the wall precisely for a clean, built-in look.

Wall cabinets should be screwed through their mounting rails directly into wall studs using appropriate cabinet screws. Drywall anchors alone are not adequate for the weight of cabinets plus dishes. Installers often use a temporary ledger board or a lift to hold cabinets level while fastening.

Compare each box against the order, inspect for scratches, dents and finish flaws, and confirm all doors, drawer fronts, fillers, panels and moldings are present. Report problems before installation begins, since replacements can take time and it is harder to resolve issues once cabinets are mounted.

Yes. Refacing projects commonly include new concealed hinges with soft-close action and can include new drawer boxes on soft-close, full-extension slides. This upgrades daily function while keeping the existing cabinet boxes, which is one reason refacing appeals to many homeowners.

Taller wall cabinets that reach the ceiling add storage and eliminate the dust-collecting gap on top. They can make a kitchen feel taller and more finished. The tradeoff is cost and the need for a step stool to reach upper shelves, which work well for seasonal items.

Minor adjustments to hinges and drawer fronts are common within the first weeks or months as the cabinets settle and humidity changes. These are normal and quick to correct. A contractor with a workmanship warranty should return to make these adjustments at no charge.

Yes, though matching existing finishes and door styles can be difficult. Some homeowners replace only the island or add a pantry cabinet in a complementary color. Others reface all doors so new and old boxes look consistent. Discuss options during the consultation.

Replacing cabinets in the same layout often does not require a permit, but local rules vary. Plumbing relocation, new circuits or structural changes generally need permits under the Florida Building Code. A licensed contractor will confirm requirements and pull permits when needed.

The toe kick is the recessed space at the bottom of base cabinets that lets you stand close to the counter without stubbing your toes. It is finished with a matching trim piece. Proper toe kick height and depth contribute to comfort while working in the kitchen.

What We Do

Our South Florida Services